TIẾNG VIỆT | ENGLISH

Home Products Samsung Products


RF30 Series

Loader / Unloader
Dispenser
Chip Mounter - CP Series
 Chip Mounter - SM Series
Reflower
Full-line SMT

 

- Heating and cooling function applicable for the lead-free soldering of various boards
- Energy saving design considering the global warming
- Compact design emphasizing the productivity and floor environment
- Flux recovery function that increased the degree of cleanliness of oven exhausted air
- Added rich productivity management information for operation status, history and output management
- Electrical wiring and structure frame design that improve the maintenance-ability.


Heating System
Air flow furnace with high heating efficiency is realized by adopting multi heating zones so that it can be applicable for the various types of component placement on board and at the same time by applying the nozzle structure for which the air flow resistance is improved.

• Multi heating zones and new air flow method allow the temperature profile with stable wind speed.

• Even the placement of components on the boards such as multi-layered board or the board where components of high thermal capacity are mixed, which was difficult to perform placement with existing reflow can be realized with extremely little temperature difference between board and placed component.

• For small boards for portable equipment, the production cost, roductivity, energy consumption can be reduced and improved to a great extent by reducing the tack time.
PC Control System
PC reflow with various functions
• Reflow oven control
• More improved and subdivided error message function
• Convenient operation and handling through the classification and indication of increased temperature zone, reached temperature, etc. in colors according to the temperature setup.
• Graphic numerical control of setup temperature of each zone
Designing of Maintenance
Considering high efficiency, productivity and cost reduction, we have simplified the maintenance of the blower motor, conveyor and cooling unit and improved the convenience of the operation through efficient machine design and electrical wiring.
For cooling and Flux Recovery System
Cooling and Flux Recovery System Cleans the exhaust air and re-duces the flux contaminants in the ¡°furnace¡± to a great degree by adopting newly developed high performance flux recovery unit.

In particular, the chiller type cooling increases the cooling speed to realize highly reliable soldering.

   
Model Name RF3082 RF30102 RF30122 RF3082N RF30102N RF30122N
Apparent Power (Kw) 40kw 46kw 55kw 42kw 49kw 58kw
Approximately 9.5kw Approximately 13kw Approximately 61kw Approximately 10kw Approximately 13kw Approximately 16kw
Operating Voltage (V) 3Ø 380V 50Hz / 60Hz (3Ø 220V 50Hz / 60Hz)
Operating Current (A) 61A(105A) 70A(120A) 83A(145A) 64A(110A) 75A(129A) 88A(152A)
Outline Dimension (LxWxH) 3,938×1,340×1,450 4,938×1,340×1,450 4,938×1,340×1,450 4,413×1,340×1,450 4,938×1,340×1,450 5,633×1,340×1,450
Weight (kg) 1,800(kg) 2,000(kg) 2,100(kg) 2,500(kg) 2,800(kg) 3,000(kg)
Number of Heating Zones 8 Zone 10 Zone 12 Zone 8 Zone 10 Zone 12 Zone
Heating Zone Length (mm) 2,200 2,700 3,200 2,200 2,700 3,200
Number of Cooling Zones 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone 2 Zone
Cooling Method Air Cooling Air Cooling Air Cooling N2 Atmosphere Cooling N2 Atmosphere Cooling N2 Atmosphere Cooling
Chiller(op) Chiller(op) Chiller(op) Chiller Chiller Chiller
PCB Transfer Speed 0.3 ~ 1.6m/min
PCB Transfer Direction Left → Right(Right → Left)
Fixed Conveyer Rail Front Rail(Rear Rail)
PCB Dimension (mm) W 50 ~ 410(500:Option)
Conveyor Belt Height (mm) 885 ~ 920mm from floor(Normally 900mm)
PCB Conveying Method SUS #35 Chain 4mm Pin
Temperature Meter 16ch 20ch 24ch 16ch. 20ch 24ch
Hot Air Speed Approximately 0.5 ~ 4.0 m/sec at Pre-heater & Reflow
PCB Drop Detection Photo Sensor
PCB Stop Detection Photo Sensor
Auto Stop Stops after no-load operation for 30 minutes since the system is turned off
Oxygen Concentration Control - - - O2 Analyzer
Oxygen Concentration Indication - - - O2 Controller
Nitrogen Consumption - - - 12 ~ 15㎥/h(Based on 500PPM)
Alarm Monitor PC Monitor Indication/Emergency Stop/
Conveyor Problem/Cover Opened/
Board Drop Alarm/Board Stop Alarm/
Abnormal Temperature Alarm/Thermal Alarm
PC Monitor Indication/Emergency Stop/
Conveyor Problem/Cover Opened/
Board Drop Alarm/Board Stop Alarm/
Abnormal Temperature Alarm/Thermal Alarm/
Abnormal %, PPM/N2 Pressure
Others PC, UPS, Mesh Belt or Anti-warp Conveyor

Top


Click here for more information or contact our offices in Vietnam:
Ho Chi Minh Office
Phone: +84(8) 5446-4789
Email:
hcmc@acrosemi.com
Hanoi Office
Phone: +84(0) 91-225-7173
Email:
hanoi@acrosemi.com

    
    © 2006-2010 AcroSemi Corporation. All rights reserved.